Project Diversity
Sampling of project diversity
Flamingo Falls Professional Center
A portion of the ACBD office crew at our offices.
Flamingo Falls Professional Center, 55,000 sf
Design-Build, Own, Operate, Manage
20 Acre Office Complex |
Lil’ Rascals Academy
Lil’ Rascals Academy, 2003 |
Hopewell Missionary Baptist Church, Pompano
Main Sanctuary Structural Steel
2001 - 2002 |
Tabernacle Missionary Baptist Church, Tallahassee
Lifting the roof into place atop the structure
2003 - 2004 |
The Fountains, Ft. Lauderdale
Two – Seven Story Residential Condominium Buildings, 2007-2008 |
The Fountains, Ft. Lauderdale
Two – Seven Story Residential Condominium Buildings, 2007-2008 |
Plaza Venetia, Miami Beach
Working off scaffolding/staging with minimal
disturbance to occupants
Concrete Restoration of Two / 25+ story high
rise buildings plus town homes |
Sunshine Bird Seed Factory, Opa Locka
158' Tall Specialized Manufacturing Facility with silos |
Grand Palms Golf & Country Club Resort
Design-Build, Own, Operate, Manage
500+ Acre Golf and Country Club Resort
27 Holes of Championship Golf, 137 room hotel
All Civil: Roads, Water, Sewer, Utilities, Drainage |
Hilton Hotel, Miami Airport
Miami - Hotel |
Molasses Reef Marina, Key Largo, FL
Molasses Reef Marina - Dockominiums
Environmentally sensitive area
Design-Build, Own, Manage |
Molasses Reef Marina, Key Largo, FL
Molasses Reef Marina - Dockominiums
Environmentally sensitive area
Design-Build, Own, Manage |
Aventura Hospital, Aventura |
Club Atlantis, Miami Beach |
|
|
Tower House, Miami Beach
|
Biscayne Cove, Aventura |
|
|
Turnberry Resort, Aventura, FL |
Key Colony, Key Biscayne, FL |
|
|
Cricket Club, North Miami |
Costa Brava, Miami Beach |
|
|
Yacht Harbor, Miami Beach
|
Mariott at Omni, Miami |
|
|
Atlantis on Brickell, Miami
|
Miami Beach Government Parking Garage
|
|
|
First National Bank (now Suntrust), Miami
|
Brickell Plaza, Miami |
|
|
Saks Fifth Avenue, Bal Harbour
|
City of Sunrise
|
|
|
Office Building, North Miami
|
City of Miami Beach
|
|
|
Hallandale 2500 Building |
Anchor Bay Club, Hallandale |
|
|
Center Island, Golden Beach |
Coco Plum, Coral Gables
|
|
|
South Island, Golden Beach |
Windmill Ranches, Weston, FL
|
|
|
Windmill Lakes Estates, Weston, FL |
Four Story Tilt up, Flamingo Falls
|
|
|
Church
|
|
|
|
Name of Project |
|
Task by ACBD |
|
|
|
HOPEWELL BAPTIST CHURCH
Pompano Beach, FL
$3,500,000 project
25,000 SF Church and facilities
Structural Steel, One piece metal roof (complete roof built on
ground and entire system flown into place on one day),
Reinforced masonry design.
General Contractor, Construction Manager, Inspections
Contact: Reverend Robert Stanley, Deacon Al Laster - 954-675-5449 |
|
|
|
|
|
|
|
|
TABERNACLE MISSIONARY BAPTIST CHURCH
Tallahassee, FL
25,000 SF Church
Sunday School Classrooms, Chapel, Administration Building, Retaining walls, Deep foundation, Reinforced Masonry, Structural Slab, System, Metal roof
$3,500,000 project
Contact: Deacon Harvey LaCount - 850-599-3405 |
|
Completed Phase I September 2004
Completion Phase II December 2005
Design Build Project
|
|
|
|
|
|
|
TURTLE RUN DEVELOPMENT
Vero Beach, FL
47 Acres, $60,000,000++ total project when complete
ACBD is the owner/operator of this project
Originally zoned for 120 trailers, we developed plans, civil engineering and successfully petitioned the City and County
to change the zoning to 180 Single Family homes. This increased the value of the property and its potential tremendously, so much so that many offers have been presented to us by large builders who would like to purchase the entire project at a very attractive profit.
Contact: Sandy S. Segall |
|
Development Stage,
Civil Complete, Own |
|
|
|
|
|
|
MARATHON, FL PROPERTIES
Serenity Cove, $74,000,000+ upon completion
Anchor Light, $15,000,000+ upon completion
Keys Country, $30,000,000+ upon completion
ACBD is the owner/operator of this project
All three waterfront properties have already been purchased and are in various stages of development.
These three properties are from start to finish projects including but not limited to purchase of raw land, Reg D raising of capital, preliminary plans, negotiations with County and City Officials for entitlements (zoning rights), full sets of drawings including Architectural, Civil, Structural Engineering etc., construction, sales and marketing.
Contact: Sandy Segall - 954-447-7775 |
|
Development Stage |
|
|
|
|
|
|
LIL’ RASCALS DAY CARE
Pembroke Pines, FL
15,000 SF Commercial / School Building
$2,700,000 project
CBS construction, Open Web Joists, Roof Trusses
Contact: Doug Millard 954-584-2134 |
|
Completed Oct 2003
General Contractor,
Develop, Inspections |
|
|
|
|
|
|
BERGERON PROPERTIES
Pembroke Pines, FL
Office / Warehouse / Industrial Park
150,000 sq. ft. + Design complete (4/04)
Tilt up and CBS with structural steel and structural slab system
First two new buildings are 70,000 sq. ft. -
$750,000 Structural Steel and Roof Contract, supply and erection by ACBD at this time.
Various interior build outs for existing buildings.
Roughly 40,000 sq. ft. completed to date – ongoing projects as new tenants sign leases.
Roughly $450,000 to date for interior build outs.
Contact: Phil Saia - 954-680-0223 |
|
Design, Construction, Inspection
Construction Management |
|
|
|
|
|
|
GRAND PALMS HOTEL AND CLUBHOUSE
110 Grand Palm Drive, Pembroke Pines
Principals of ACBD are the owner/developer/operator of this project which from purchase, design, development, civil infra structure work and construction by ACBD has over 1,200 high end homes, golf courses, tennis complex, spa, hotel buildings, banquet facilities, clubhouse etc
2008redevelopment will be for 737 condo and condo-tel units, new public spaces etc.
$600,000,000++ project
Contact: EM Segall - 954-431-8800
Sandy Segall - 954-447-7775 |
|
Completed 1990, Redevelop 2008
Design, Develop, Build and Own |
|
|
|
|
|
|
SKYLAKE EXECUTIVE INDUSTRIAL PARK
19501 NE 10th Ave., North Miami Beach, FL
Collection of 8 Office buildings and warehouse buildings, approximately 300,000 sq. ft.
$15,000,000+ project |
|
1974-1978
Design, Develop, Build and Own |
|
|
|
|
|
|
FLAMINGO FALLS PROFESSIONAL CENTER
Pembroke Pines, FL
20 acres of Professional Buildings
Roughly 230,000 sq. ft. |
|
Own, Design, Develop, Build, Operate
First Building Fully Leased
Day Care Building Built and Sold
Second and Third Building |
|
|
|
- Building One Complete and Fully Occupied
ACBD performed conceptual Design, Shell, Finish as well as all Interior Build Outs
$16,000,000+ project
Tilt up FOUR story building (one of the first this tall for tilt up) |
|
|
|
|
|
- Building Two is complete in Design and Architectural
100,300 sq. ft. Combination of Retail and Office
$25,000,000+ project – plus interior build outs |
|
Start Date May 2008 (in for permit) |
|
|
|
- Building Three is an Office Condo Building of 55,000+ sf.
Currently under design development
$16,000,000+ project – plus interior build outs
Contact: Sandy Segall - 954-447-7775 |
|
|
|
|
|
|
|
|
THE FOUNTAINS
Ft. Lauderdale, FL
Two - Seven Story Buildings with two floors under the water table
And a roof top pool with 51 high end units
$28,000,000+ construction project |
|
Completed 2009
General Contractor |
|
|
|
|
|
|
SUNSHINE BIRD SEED
Opa Locka, FL
$4,000,000 Warehouse and Production facility (158 feet tall)
Structural Steel, Piling, Pile Foundation, Pile Caps, Silos, Elevators
Conveyor Belts, Insulated Metal Siding
Contact: Andy Perera - 305-593-2666 |
|
Design and Build
Completed December 1997 |
|
|
|
|
|
|
Plaza Venetian Condo
Renovation Project, $4,500,000
Balconies, Stucco, Roofing for 28 story project |
|
Design and Construction Management |
|
|
|
|
|
|
GREAT WESTERN HOMES
8950 - 8990 SW 6th Court
Plantation, FL
20 Townhomes, 1850 sq. ft. each
$3,000,000 project |
|
Completed 6/89
Design, Develop and Build |
|
|
|
|
|
|
TENNESSEE GREYSTONE DEVELOPMENT
Townsend, TN
256+ Acre Mountain Development
Mixture of Hotel Resort, Cabins and Campsites
Also a stone and marble quarry
Design Complete (subject to modifications)
Roads and Storm Water Management 75% complete (through cutting, benching, crowning, ditching, culverts etc.)
Balance of project upon sales of units
$14,000,000+ project |
|
Design, Develop, Build and Own |
|
|
|
|
|
|
MOLASSES REEF MARINA
1550 Ocean Drive, Key Largo, FL
79+ slip marina in National Park Preserve
Directly on Ocean with ¼ mile jetty, driven piles, structural concrete
Docks, Piling, Electrical, Plumbing, Low Voltage etc.
$8,000,000+ project
Contact: Norman Wartman 305-469-3660
Sandy Segall - 954-447-7775 |
|
Completed 1995
Design, Develop, Construction, Own |
|
|
|
|
|
|
KEYS PROPERTIES
Marathon, FL
150 +/- Condo and Condo-Tel units, Docks, Common Areas, Environmental Design and Concerns
$250,000,000+ project
Contact: Norman Wartman 305-469-3660
Sandy Segall - 954-447-7775 |
|
Design, Develop, Construction, Own
2008 |
|
|
|
|
|
|
SINGLE FAMILY
Residential Homes throughout Florida
From 4,000 to over 10,000 sf typically very high end residences
• Coco Plum
• Eastern Shores
• Golden Beach
• Golden Isles
• Orlando
• Weston
• Grand Palms Golf and Country Club Resort (Pembroke Pines) etc.
Over $50,000,000 of single family homes built over the several years |
|
Design and Build |
|
|
|
|
|
|
|